Title 24 Energy Compliance in Chino, CA
Title 24 energy compliance is a required calculation report – produced by a certified energy analyst – that demonstrates your ADU meets California’s Building Energy Efficiency Standards before the city issues a permit. In Chino, every new ADU and most garage conversions require a stamped Title 24 report as part of the permit set. Without it, the building department will not accept your application, and construction cannot legally begin.
At Ellery ADU Studio, we handle Title 24 as an integrated piece of your ADU Design & Permitting in Chino package – not a separate engagement you have to chase through a third party. The report is coordinated alongside your architectural drawings so the two documents agree: wall assemblies, window U-factors, mechanical systems, and insulation values are consistent across the entire permit set. That alignment is what gets permits approved in Chino without a round of corrections.
If you want to understand exactly what a Title 24 report will cost for your project before any work starts, call us at (909) 323-1107. A live person picks up, written pricing follows – that is Haven Standard Clause 1, and it applies to every project we touch.
When You Need Title 24 Energy Compliance
- You’re building a new detached ADU. Any new structure in Chino requires a Title 24 report. The Inland Empire’s climate zone – Zone 10 under California’s classification – carries specific solar heat gain and cooling load requirements that differ from coastal jurisdictions, and your report has to reflect those numbers, not generic statewide defaults.
- You’re converting a garage to a living unit. A garage conversion in Chino triggers the same energy code as new construction because the occupancy classification changes. The existing walls and ceiling almost certainly need insulation upgrades, and the Title 24 report tells you exactly where and how much.
- Your permit application came back with a Title 24 correction notice. Chino’s building department will flag a report if the compliance margin is too thin, if the HVAC system specified doesn’t match the equipment schedule, or if the calculation software version is outdated. We review correction notices and issue revised reports without reopening the entire design fee.
- You’re specifying a prefab or modular unit. Systems like Plant Prefab and Mighty Buildings ship with their own thermal envelope data, but California still requires a site-specific Title 24 report that incorporates that manufacturer data into your lot’s orientation and local climate assumptions. We have done this for prefab ADUs in Chino and know which manufacturer specs translate cleanly and which require supplemental documentation.
- Your ADU has non-standard glazing or a rooftop solar array. Chino’s sun exposure is significant – summer cooling loads are real here in a way they are not in San Francisco. If your design includes large south- or west-facing glass, the Title 24 calculation has to model that thermal load accurately, or the report will fail. Solar offsets can improve compliance, but the methodology has to be documented correctly.
- You inherited a partial permit set from a previous designer. If another designer started your project and handed off incomplete documents, we can pick up the energy compliance piece without requiring you to restart from scratch. We review what exists, identify the gap, and deliver the report that closes it.
Our Title 24 Energy Compliance Process

- Written scope and price before we open any software. Under Haven Standard Clause 1, you receive a written price for the Title 24 report before we begin. That price covers the compliance calculation, the compliance documentation forms (CF-1R, CF-2R, CF-3R), any one round of city corrections, and coordination with the architectural drawings. No door-side additions once the project starts.
- Site and design intake. We collect your site address, lot orientation (critical in Chino’s east-west street grid), architectural floor plan, window schedule, roof assembly, and mechanical system specifications. If those documents don’t exist yet – because we’re starting from the design phase – we gather the data during the same session used to produce the drawings. One conversation, not two.
- Climate zone assignment and compliance path selection. Chino sits in California Climate Zone 10, which carries a higher cooling load threshold than most of Southern California’s coastal zones. We confirm the correct zone assignment and select the compliance path – prescriptive or performance – that gives your specific design the most efficient route to approval. Performance path is usually the right call for ADUs with larger glazing areas or high-efficiency mechanical systems, because it allows trade-offs that the prescriptive checklist doesn’t permit.
- Energy model and report production. We run the calculation using current California Energy Commission-approved software, cross-reference the output against your architectural drawings, and confirm that every assembly value stated in the report matches what is drawn on the plans. Discrepancies between a Title 24 report and the architectural set are the most common reason Chino plan check sends ADU permits back for corrections. We catch those discrepancies before submission.
- Permit set integration and submission support. The completed Title 24 compliance documentation – the CF-1R summary and the supporting worksheets – is packaged with your architectural drawings, structural calculations, and site plan as a single permit application. We coordinate with the City of Chino’s Building and Safety Division and respond to plan check comments as they come in. You don’t manage that correspondence.
- Field verification documentation. California requires that certain energy measures be verified during construction – insulation installation, duct leakage testing, and HVAC commissioning are the most common. We document what is required for your specific project and, under the 365-Day Done Right Promise, confirm that the finished ADU was built to the permitted drawings. If something in the field deviates from the energy compliance plan, we address it before final inspection, in writing, as part of the same contract.
Before
AfterTitle 24 Energy Compliance Pricing in Chino
Title 24 energy compliance reports for ADUs in Chino typically run in the ranges below. These are honest market numbers based on the scope of work involved. Every project at Ellery ADU Studio is quoted with a written price before work begins – per Haven Standard Clause 1 – so the number you see in your proposal is the number on your invoice. See How Much Does ADU Design & Permitting Cost? (2026 Price Guide) - Chino, CA for related pricing.
| Project Type | Typical Title 24 Report Range | What Affects the Number |
|---|---|---|
| Garage conversion ADU (up to 600 sq ft) | $650 – $950 | Existing wall/roof assembly complexity, HVAC system type |
| Junior ADU / interior conversion | $550 – $850 | Whether the unit is fully conditioned or partially shared with main house systems |
| New detached ADU (600 – 1,000 sq ft) | $850 – $1,300 | Glazing area, orientation, solar system inclusion, mechanical complexity |
| New detached ADU (1,000 – 1,200 sq ft) | $1,100 – $1,600 | Performance path modeling, duct design, two-zone HVAC systems |
| Correction report (city plan check response only) | $250 – $500 | Scope of correction; first round of corrections is included in our standard scope |
A few things that move the number up or down in Chino specifically:
- Lot orientation. A unit with significant west-facing glass on a lot oriented toward the afternoon sun in Chino’s climate will require performance path modeling, which takes longer to run and validate than the prescriptive checklist approach.
- Solar PV offset. If your design includes a rooftop solar array – either as a required compliance measure or as an elective upgrade – the report has to incorporate the PV output into the compliance model. That adds calculation time but often enables a less expensive mechanical system to comply.
- Prefab or modular thermal envelope data. Mighty Buildings and Plant Prefab units ship with tested thermal performance values, but integrating manufacturer certificates into a site-specific California Title 24 report adds a document coordination step that is reflected in the price.
- When Title 24 is bundled with full design-build. When your Title 24 report is part of a full Ellery ADU Studio design-build contract – drawings, permitting, and construction under one written price – the report is included in the all-in project cost, not billed separately. The bundled price is lower per line item than commissioning each piece independently.
Call (909) 323-1107 to get a written price for your specific project. That call costs you nothing, and the estimate is free.
FAQs – Title 24 Energy Compliance in Chino

What is a Title 24 report and why does Chino require it?
A Title 24 report is a California-mandated energy compliance calculation that proves your ADU meets the state’s Building Energy Efficiency Standards before a permit is issued. Chino’s Building and Safety Division requires it as part of every residential ADU permit application because the state code applies uniformly to all California jurisdictions. The report is not a suggestion or an advisory document – without a stamped, approved Title 24 compliance package, the city will not issue a building permit. Chino sits in Climate Zone 10, which means the compliance thresholds for cooling loads and window heat gain are stricter than what you’d encounter in a coastal city. A report prepared for the wrong climate zone will be rejected at plan check. Call (909) 323-1107 for a written price on your project before you do anything else.
Can I use the same Title 24 report for a prefab ADU that the manufacturer provides?
No – the manufacturer’s energy documentation is input data, not the compliance report itself. California requires a site-specific Title 24 report that takes the manufacturer’s tested assembly values and runs them through an energy model calibrated to your lot’s orientation, local climate zone, and mechanical system. A Plant Prefab or Mighty Buildings unit will come with tested thermal envelope data that makes the compliance calculation faster and often easier to pass, but that data has to be incorporated into a California Energy Commission-approved software model specific to your Chino address. We have coordinated this for prefab ADUs and know what each manufacturer’s documentation package includes and what still needs to be calculated on our end. Call (909) 323-1107 for a written quote on this specific scope.
What happens if my Title 24 report fails Chino plan check?
Chino’s building department issues a correction notice listing specific deficiencies – typically a mismatch between the report’s assembly values and the architectural drawings, an outdated software version, or a compliance margin that falls below the required threshold. When that happens, we revise the report and respond to the correction notice as part of the same engagement. The first round of city corrections is included in our standard Title 24 scope – you won’t receive a separate invoice for that revision. If corrections run beyond the first round due to a scope change you request, we’ll give you a written price for the additional work before we proceed. Call (909) 323-1107 if you’ve already received a Title 24 correction notice and want to know exactly what it will take to resolve it.
How does Title 24 fit into the full ADU permit set in Chino?
The Title 24 compliance documentation – the CF-1R summary form and its supporting worksheets – is one part of a complete Chino ADU permit set, which also includes architectural drawings, a site plan, structural calculations, and a soils report if the lot requires one. The energy report and the architectural drawings have to agree on every assembly value: wall R-values, window U-factors and solar heat gain coefficients, roof insulation, and HVAC specifications. When those documents are produced separately by different parties, mismatches are common and plan check corrections follow. When we produce both under the same ADU Design & Permitting in Chino contract, we reconcile them before submission, which is the practical reason our permit applications move through Chino’s plan check faster than piecemeal sets. For the full picture of how the permit set comes together, visit our home page or call (909) 323-1107.
Why Chino Homeowners Work with Ellery ADU Studio on Title 24
Nadia Ellery founded Ellery ADU Studio in 2015, the same year California began meaningfully expanding ADU rights. In the years since, we have handled ADU Design & Permitting services for more than 900 ADUs, every one of them with a written price before work started and a documented photo record when work was complete. That volume means we have run Title 24 calculations for nearly every site condition Chino presents: narrow lots in the older neighborhoods near D Street, larger parcels in the newer developments closer to the 71 Freeway, and mid-century homes in areas like Eucalyptus Avenue where the existing construction doesn’t always match what the records show.
We are a design-build studio, which is a specific structural choice. Our ADU Design & Blueprints, the permit set, and the construction are one contract at one written price. That matters for Title 24 because the energy compliance report has to remain accurate all the way through construction, not just at permit submission. If a subcontractor in the field substitutes a window unit with a different U-factor, or if insulation is installed at a lower R-value than the report specifies, the Title 24 compliance that was documented at permit submission is no longer valid – and the project can fail final inspection. Under the 365-Day Done Right Promise, if the finished ADU is not built to the permitted drawings, we make it right. In writing, before the project starts.
We also offer a Free Second Opinion on any written Title 24 estimate you’ve already received. If another firm quoted you a number for energy compliance services, bring it to us. We’ll review the scope, tell you what it includes and what it doesn’t, and give you our own written number. No obligation, and no vague conversation – a written comparison you can evaluate on your own time.
To get a written price for Title 24 energy compliance on your Chino ADU from ADU Design & Permitting Near Me in Chino, CA, call (909) 323-1107. A live person answers. Written pricing follows the same day.
Written by Nadia Ellery, Owner at Ellery ADU Studio Chino, serving Chino.